Grenfell tower update

daryanblog

grenfell_panel_rytest Cladding samples are being taken away for testing across the UK

Given recent events I think an update was needed on the Grenfell fire situation as events have moved rather quickly. As I wrote my last piece there were reports in the media which suggested that the contractors at Grenfell may have used cladding products that weren’t suitably fireproof (and illegal on a building this tall). I was inclined to ignore these rumours until such time as they was confirmed by official sources, ideally the ongoing investigation into the fire. The UK media is well known for jumping to the wrong conclusions and I didn’t think it as credible that such a huge error could have been made given how well regulated the building trade is in the UK.

Well it would appear I was wrong. Tests on panels from the buildings and on other structures across the UK have…

View original post 1,059 more words

Advertisements

About daryan12

Engineer, expertise: Energy, Sustainablity, Computer Aided Engineering, Renewables technology
This entry was posted in Uncategorized. Bookmark the permalink.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s